What your team tells Lersyn

A few things your team tells Lersyn drive much of what it shows. RAG status, Spotlight and the weekly update are set in Lersyn, on the deal card, by Editors and above. RAG status is the team's confidence in the deal: red means it needs intervention, amber means there are issues you should know about, and green means on track. Late-stage amber and red deals are where your attention is worth most. Spotlight is a yes/no flag for anything you want raised at this week's pipeline call. The weekly update is the rep's short commentary. Next step and due date come from HubSpot and drive the Next Steps screen and the history on the deal card. A deal with no next-step text won't appear on Next Steps at all, even if it has a date.

A few things your team tells Lersyn drive a lot of what it shows you. None of them is compulsory, and Lersyn works without them. But each one adds a layer of insight that can't be worked out any other way, because it's judgement rather than data.

RAG status, Spotlight and the weekly update are set in Lersyn: on the deal card, by Editors and above, on every plan. There's nothing to create or map in HubSpot, and nothing is written back to it. Every change is kept with who made it and when, so week-on-week movement shows in the Change Tracker. A new workspace starts with all three blank. (A few workspaces read them from HubSpot properties instead. If yours does, they're set in HubSpot and listed on the field mapping screen.)

Next step and its due date stay in HubSpot, where your reps already keep them.

RAG status

Your rep's own confidence in the deal.

  • Red: material problems that need management to step in.
  • Amber: progressing, but with issues leadership should know about and a plan to deal with them.
  • Green: on track.

Where it earns its keep is late-stage amber and red. A deal at 60% probability with an amber flag is where an hour of a sales leader's time is worth most, and it doesn't show up in any report that only looks at stage and value.

RAG only works if people are honest. A team that marks everything green gets no help, and its manager gets no warning. When you introduce it, say out loud that amber isn't an admission of failure. It's a request for support.

RAG status is a judgement, not a calculation, so there's nothing to configure and no threshold behind it. (Admin does have a setting called RAG thresholds, but it controls something else entirely: how progress against target is colour-coded. See Admin and settings.)

Spotlight

A simple yes/no flag, set with the star on the deal card. The habit worth building is to flag anything you want discussed at this week's pipeline meeting: a new deal worth knowing about, a material change, a problem you need help with, or a win worth sharing.

Spotlighted deals appear on both Weekly Update and Pipeline Overview, so the agenda for your pipeline call builds itself during the week instead of in the ten minutes before it.

Weekly update

The rep's own short commentary on where the deal stands this week, written on the deal card. The latest one shows with its age, so a stale update is obvious at a glance, and every earlier one is kept in the history below. Pasting a call transcript drafts one for you to edit, on the Professional plan and above.

My deals this week

The quickest way to get through all of this before the pipeline call. My deals this week lists every open deal for one owner, with RAG, Spotlight and the weekly update editable in place: click a colour, click the star, or press Add update and type. It opens on your own deals when your Lersyn email matches your HubSpot user, and on everyone's otherwise; the Owner filter switches between them. Not updated this week hides the deals you've already done, and the counter at the top ("12 of 18 updated") moves as you go. Click a deal's name for the full deal card. For Editors and above, on every plan.

Next step and due date

The immediate commitment on the deal, and when it's due. These drive the Next Steps screen and build the next-step history on the deal card.

One thing to know: a deal with no next-step text won't appear on the Next Steps screen at all, even if it has a date. That's deliberate, because a date with no commitment attached isn't a next step. It does mean Next Steps shows you the deals your team is actively working, not every deal you own.